详细说明
它包括一段橡胶管道和固定在管道两端的与之焊接在一起的法兰(2),管道的管壁为多层结构,该多层结构由内而外包括有最内层的内衬层(6),缠绕在内衬层(6)外的钢丝帘线骨架层(8),贴覆在钢丝帘线骨架层(8)外的隔离层(9),缠绕在隔离层(9)外的增强层(10),贴覆在增强层(10)外的内外覆层(11),内外覆层(11)和外覆层(13)之间设有浮体层,其中:钢丝帘线骨架层(8)和增强层(10)由高强度的钢丝帘布组成。 The utility model provides a self-belt steel cord floating dredging rubber tube, which includes a rubber pipes and fixed at both ends of the pipe are welded together with a flange (2), the pipe wall is a multilayer structure, the from the inside of the multilayer structure including the inner liner layer (6), winding the inner liner (6) outside the skeleton steel cord layer (8), attached to the skeleton coated on steel cord layer (8) outside the isolation layer (9), wound around the insulating layer (9) outside of the reinforcing layer (10), affixed to cover the reinforcing layer (10) outside of the inner and outer cladding layer (11),
已成功完成东太湖长漾湖生态清淤试点:东太湖生态清淤试点项目,为江苏苏州市吴江区平望镇长漾湖(包括雪落漾)生态治理项目中的岸线形态调整、生态清淤、堤防护岸、生态湿地、排泥场及绿化等六项内容之一。长漾湖呈狭条形,从西南至东北长5km,面积6.85km2,生态清淤总土方量为155.3万m3,施工区平均清淤厚度43cm。湖底清除淤泥分别需排至长漾湿地和雪落漾湿地。