塑胶面层施工方法:
Plastic surface layer construction method:
(1).施工前对地基检测,清理现场、放水,把积水部分画出来以备修补,把配料及搅拌场地准备好,保持配料场地及周围的干净,按工艺线画线,放施工线,白线盖住接缝。
(1). Before the construction of foundation inspection, cleaning up the site, drain, the water drawn to repair, the batching and mixing the site is ready, keep the batching site and the surrounding clean, according to the process line for line drawing, line construction, white cover seams.
(2).配料:严格执行公司技术部下达的工艺配方,准备计量各组分,搅拌均匀。所需工具:台称、配料桶、搅拌桶、搅拌机、开桶板子、钳子、刀子。
(2). The ingredients: the technical formulation of the technical department of the company is strictly enforced, and the formulation of the measurement is made, and the mixing is uniform. Required tools: Taiwan said, blending bucket, mixer, mixing barrel, barrel, pliers, knife board.
(3).搅拌:浆料、黑胶粒按一定比例搅拌均匀,每组充分搅拌。
(3): black particles, slurry mixing. According to a certain proportion, stirring evenly, stir in each group.
(4).摊铺:摊铺前应检查好地基是否平整,并做相应措施。施工次序由内向外,减少对成品的污染。
(4). Paving: before spreading, the foundation should be checked before the foundation is flat, and the corresponding measures are made. Construction sequence from the inside out, reduce the pollution of the finished product.
(5).修边:接边部位由指定技术人员修整,在接硬边时,应根据坡度调整,在接软硬边时,应对硬边清理打磨,以保证粘接的牢固性。修边人员并随时检查厚度、平整度。
(5) repair: the next part by the designated technical personnel to repair, in the hard edge, should be adjusted according to the slope, in the hard and soft edges, to meet the hard edge of cleaning and polishing, in order to ensure the bonding of the firm. Repair and inspection staff and at any time to check the thickness, flatness.
(6).面层:由指定技术人员操作,待底层干透、稳固后,将纯胶均匀喷涂于面层,厚度为1-2mm。
(6). The surface layer: by the specified technical personnel operation, until the bottom dry, solid, the pure glue evenly coated in the surface layer, the thickness of 1-2mm.
(7).清理:待塑胶熟化好后收防滑颗粒,修边清理下一个工作面。按铺胶图要求把塑胶面层全部铺完,整体清理场地。
(7). To be clear: after receiving plastic curing anti-skid particles, trimming a clean face. According to the shop floor, the plastic surface layer is covered, the whole cleaning site is finished.
(8).放线:按平面布置图放线。所需工具:钢尺50米(鉴定过)、经纬仪2″。
(8). Put the line: in line with the layout of the plan. Required tools: ruler 50 meters (identified), theodolite 2 ".
(9).喷枪:所需工具:喷线、喷枪、气泵。
(9). The gun: required tools: spray line, spray gun, air pump.
济南贵康体育设施有限公司秉承“诚信双赢、服务至上”的企业理念,将以先进的专业技术,一流的工程质量,真诚的合作精神,专心致力于大、中、小学校,幼儿园及社会各界的体育场地建设改造,向社会提供优质的产品,优良的服务,奉献我们的精品工程。
Ji'nan Kang sports facilities Co., Ltd. adhering to the "integrity and win-win, service first" business philosophy, will be advanced professional technology, first-class engineering quality, sincere cooperation, to concentrate on large, medium, primary school, kindergarten and community sports venues to provide quality products, excellent service, dedication to our excellent project.