  对基础的要求:

  On the basis of the requirements:

  A、对基础的要求:水泥基础要求养护28天以上,沥青地基完成后,表面要压光拉毛,不可有车辙、硬结、凹沉、龟裂或开口等。

  A, on the basis of the requirements: cement based requirements maintenance more than 28 days, after the completion of the asphalt foundation, the surface should be pressure light galling, no rutting, induration, concave sink, crack, or opening.

  B、清理现场,放水,把积水部分画圈,把配料、搅拌场地清理好,保持配料场地及周围的平干净。

  B, clean up the site, drain, the water circle, the batching, mixing site clean up good, keep the ingredients venues in and around the flat clean.

  C、严格按工艺配比各组分搅拌均匀。所需工具有:台称、配料桶、搅拌桶、搅拌机、开桶板子、钳子、刀子。

  C, strictly according to the proportion of the process of mixing evenly. Required tools: Taiwan said, blending bucket, mixer, mixing barrel, barrel, pliers, knife board.

  D、封底找平:把积水部分用料找平,然后封底消泡,采用工具有:带桎子筢子、油灰刀、脚踏板、铝合金刮板。工艺要求:13mm成品,底胶厚度:10±1mm厚。

  D, the back cover leveling: the water material leveling, and then cover defoaming, use the tools: fetters rake, putty knife, pedal board, aluminum alloy scraping belt. Process requirements: 13mm finished, the end of the adhesive thickness: 10 + 1mm thickness.

  E、在底胶上放水,把积水处按上术工艺处理找平,至底胶无积水。

  E, at the end of glue water, the water in the operation process of leveling, glue to the bottom without water.

  F、按场地工艺要求放施工线,要求工艺线盖上施工线及接缝,按面胶配比各组份,把料搅拌均匀,摊铺刮平,修边修平,消泡。所需工具带桎子、抹子油灰刀、脚踏板、消泡笤帚。

  F, according to the site requirements of the construction line, the process line to cover the construction line and joints, according to the proportion of each of the ingredients, the material is mixed evenly, spread to scratch, repair and repair the edge, the bubble. The tools required to bring across sub, putty knife, trowel pedal, defoaming broom.

  G放工艺线,按场地尺寸线宽划出整个场地,有胶带粘好,刷油漆,然后揭下胶带。所需工具材料:钢尺、钢卷尺(30m以上)经纬仪、线盒子、聚氨酯漆。

  G put the process line, according to the size of the site to draw the entire site, there is a good adhesive tape, brush paint, and then remove the tape. The required tools and materials: steel, steel tape (above 30m) theodolite, line box, polyurethane paint.

  济南贵康体育设施有限公司秉承“诚信双赢、服务至上”的企业理念,将以先进的专业技术,一流的工程质量,真诚的合作精神,专心致力于大、中、小学校,幼儿园及社会各界的体育场地建设改造,向社会提供优质的产品,优良的服务,奉献我们的精品工程。

  Ji'nan Kang sports facilities Co., Ltd. adhering to the "integrity and win-win, service first" business philosophy, will be advanced professional technology, first-class engineering quality, sincere cooperation, to concentrate on large, medium, primary school, kindergarten and community sports venues to provide quality products, excellent service, dedication to our excellent project.