BX840/900型双层彩钢压瓦机设备为博翔机械自主研发设备的一款创新级压瓦机设备,他既结合了目前常用的双层压瓦机设备的所有优点,又在此基础上大胆创新,将仿古琉璃瓦版型一同设计并生产,从而达到了一机三用的效果。
BX840/900 type double caigang pressure tile machine equipment for bo cheung mechanical independent research and development equipment a innovation level pressure watts machine equipment, he is combined with the common double pressure machine equipment, all of the advantages, and based on this bold innovation, will archaize glazed tile version to design and manufacture together, so as to achieve the effect of the 3 use.
该双层琉璃瓦设备将840型仿古琉璃瓦,840屋顶瓦,900墙面瓦结合在同一台设备上生产,并且三种版型也可根据客户需求定做生产。因此,完全可以达到一台设备同时出三种不同版型的需求。这也顺应了客户的基本需求,既节省空间,也节约成本,特别适合于刚刚建厂的中小型企业的选择。
The double glazed tile equipment will type 840 archaize glazed tile, 840 roof tile, 900 metope watts in the same device with production, and three version to also can produce according to customers' special needs. Therefore, can achieve a device and the three different version to demand. This also complies with the basic needs of customers, save a space already, also save cost, particularly suitable for just a plant of small and medium enterprises choice.
压瓦机安装之整体提升法
Pressure tile machine installation of the ascent of the law
整体提升法是指在结构柱上安装提升设备,将在地面上总拼好的网架提升就位的施工方法。网架整体提升法使用的提升设备一般都比较小,如升板机、液压滑模千斤顶等,利用小机群安装大网架,起重设备小,成本低。提升阶段网架的支承情况与使用阶段相同,不需要考虑提升阶段而增设加固措施,较整体吊装法经济。彩钢压瓦机整体提升法适用于周边支承及多点支承网架。施工重点是同步提升的控制以及网架空中位移的控制
The ascent of the method is to point to in structure column in lifting equipment installation, will be on the ground total spell good rack ascension in place the construction methods. The ascent of the method of network use lifting equipment is compared commonly small, such as machine, hydraulic slide/jack etc, using the machines installation big rack, lifting equipment is small, the cost is low. Improve the bearing rack with stage use the same stage, need not consider ascension stage and adding reinforcement measures, integral hoisting method is economic. Caigang pressure tile machine the ascent of the law applicable to peripheral supporting and more support network. Construction is focused on the ascending simultaneously control and network the displacement of the air control