详细说明
Eccentric Reamer System Step-by-step
1. When drilling starts, the reamer swings out and reams the pilot-hole wide enough for the casing tube to slide down behind the drill the drill bit assembly.
2. When the required depth is reached, rotation is reversed carefully, where upon the reamer swings in, allowing the drill bit assembly to be pulled up through the casing.
3. Casing tubes that are to be left in the drilling hole should be sealed at the bottom of the hole by means of cement grout or some other sealing agent.
4. Drilling continues to the desired depth in the bedrock using a conventional drilling.
drilling.Specifications:
Model
KEOD90
KEOD115
KEOD140
1
Casing Tube
Maximum
O.D.: 115mm
Minimum I.D.: 102mm
Maximum
O.D.: 142mm
Minimum I.D.: 128mm
Maximum
O.D.: 171mm
Minimum I.D.: 155.6mm
更多产品