  Combination cold storage installation steps:

  First is site selection, combined cold storage installation environment have certain requirements for installation of the floor must be dry, smooth, hard, general is concrete, the surface can also be used stone. If there is a sunken place, available cement or mortar bridge. Should have drainage location nearby. If it is installed in the outdoor must be added a canopy, prevent often weathered in use process, shorten service life. If it is indoor refrigerator, should also pay attention to the ceiling height should be higher than that of library on the roof surface of at least half a meter, if use the ceiling type unit, room clear height should be higher than 1.8 m on the roof surface.

  Next is the installation of the cold storage, can be in three major ways:

  1, the library body: first loading plate, the wooden plate along the long direction on the surface of the straight, plate according to the 500 mm to 200 mm spacing arrangement, gap between plate and ground use gaskets leveling. Plate after plate, in order to be good auxiliary on wood plate, and tighten hook, board with board seam should fit closely, whether all floor level test should be used in the same plane, and gaskets leveling. Then the wallboard, starting from the Angle of an Angle of the plate, to several other surface extension in turn. Finally, the roof, the same sequence and base plate. After the installation is complete, all library board reload trim up and down.

  2, cold storage doors, cold storage doors have a variety of categories, different door installation method and matters needing attention. Sliding door, for example, when installation is simply two steps:

  (1) to two M10 double end studs and ball head nut wall fixed;

  (2) to six Æ 5 * 13 rivet will guide rail is fixed on the library body wall or partition board.

  3, refrigeration units, mainly divided into some matters needing attention:

  (1) compressor as close to the evaporator, the better, easy to heat dissipation and maintenance;

  (2) the partial upper radiator is best installed on the host;

  (3) wires to discharge all the wires, except must use cable tie fasten with corrugated hose or go trough wear pipe protection, temperature display wire with wires together as far as possible;

  (4) solid wire connectors, contact correct;

  (5) for all throughout parts of base plate, base plate and gaps parts sealed with sealant. Combination of cold storage after the installation is complete, debugging, testing view of the above parts, after, can call it a day.